DAILY TRAFFIC REVIEW MINUTES of PARADIP PORT TRUST

Please click below link of PPT to access the DTR MINUTES.

http://www.paradipport.gov.in/dtu.php







Saturday, October 11, 2014

HUDHUD - PORT WARNING FROM INDIAN METEOROLOGICAL DEPARTMENT, BHUBANESWAR AT 1200 HRS/11.10.2014

Port Warning NoTwentyfive FOR PARADEEP, PURI,CHANDBALI AND GOPALPUR PORTS.
CYCLONE Warning-Seven for South Odisha Coast
Date and Time of issue: 11-10-2014 at 1200EF
The Very Severe Cyclonic Storm ‘HUDHUD’ over westcentral Bay of Bengal moved westwards during past six hours and lay centered at 0830 hrs IST of 11thOctober 2014 near latitude 15.9ºN and longitude 85.4ºE, about 380 km south-southeast of Gopalpur.
Forecast:
The system would move west-northwestwards for some more time. It would then move northwestwards and cross north Andhra Pradesh coast around Visakhapatnam by the forenoon of 12thOctober 2014.
Advice for hoisting Storm Warning Signals:
Keep hoisted Local Cautionary Signal Number Three (LC-III) at your port.
Likely impacts and actions:
Squally wind speed reaching 50-60 kmph gusting to 70 kmph from Northeast direction would prevail along and offOdisha coasts and the wind speed would increase to 80-90 kmph along and off Odisha coast from today evening . Sea condition would be rough to very rough in next 12 hours and thereafter it would be very rough to high along and offOdisha Coast.
Fishermen Warning :-
 Total suspension of fishing operations along and off Odisha Coast.Fishermen are advised not to venture into sea.
TOO: 11/1200EF

Tuesday, August 27, 2013

Enhancement of Draft at various berths for the month of October 2013 - Notification from PPT.

PARADIP PORT TRUST
MARINE DEPARTMENT
…..
No.:MD/SHS/TECH-26/2012(Vol.I)/                                              Dated, the 27th August 2013

N O T I C E


Sub:    Enhancement of Draft at various berths for the month of October 2013


          With reference to our earlier notice regarding permissible draft at various Berths, the draft at following berths are hereby temporarily enhanced as follows for the month of October 2013 considering prevailing weather and tidal conditions:


Sl. No.
Name of the Berths
From
To
Permissible Draft
Time
Date
Time
Date
01.
SQ

0000 hrs

01.10.2013
08.10.2013
21.10.2013
2400 hrs
04.10.2013
17.10.2013
31.10.2013
13.00 Mtrs
02.
EQ-I

0000 hrs

01.10.2013
08.10.2013
21.10.2013
2400 hrs
04.10.2013
17.10.2013
31.10.2013
11.50 Mtrs
03.
EQ-II

0000 hrs

01.10.2013
08.10.2013
21.10.2013
2400 hrs
04.10.2013
17.10.2013
31.10.2013
12.00 Mtrs
04.
EQ-III

0000 hrs

01.10.2013
08.10.2013
21.10.2013
2400 hrs
04.10.2013
17.10.2013
31.10.2013
12.50 Mtrs
05.
CQ-II

0000 hrs

01.10.2013
08.10.2013
21.10.2013
2400 hrs
04.10.2013
17.10.2013
31.10.2013
13.00 Mtrs

Note:  1.       The above notice is purely temporary and can be withdrawn at any time
                   without prior information due to sudden change in weather condition.

2.       Draft for other days for above berths and draft for other berths shall remain as per the original notification No.:MD/SHS/TECH-26/2013/771 Dt.17.04.2013.

3.         In addition to the above, vessels with beam size upto 38.00 Mtrs. may also be accepted for berthing at CQ-1, SQ, EQ-1, EQ-2, IOB & CB-1 at permissible LOA & draft for the berth during favourable weather conditions.




Sd/- 
Dy. Conservator
Paradip Port Trust
To
          All Shipping Agents
          Paradip Port.

Copy to:
1.       All Exporters / Importers (Through the Traffic Manager, PPT)
2.       Traffic Manager, PPT / Chief Engineer, PPT / CE & ME, PPT / DM (MS), PPT
          3.       Harbour Master, PPT / All Pilots, PPT / SHS, PPT / Chief Officer (F), PPT / Port
                   Signal Station, PPT



Thursday, July 25, 2013

Notification regarding Enhancement of Draft for September 2013

PARADIP PORT TRUST
MARINE DEPARTMENT
…..
No.:MD/SHS/TECH-26/2012(Vol.I)/                                                   Dated, the 25th July 2013

N O T I C E


Sub:    Enhancement of Draft at various berths for the month of September 2013


          With reference to our earlier notice regarding permissible draft at various Berths, the draft at following berths are hereby temporarily enhanced as follows for the month of September 2013 considering prevailing weather and tidal conditions:


Sl. No.
Name of the Berths
From
To
Permissible Draft
Time
Date
Time
Date
01.
SQ

0000 hrs

01.09.2013
22.09.2013
2400 hrs
18.09.2013
30.09.2013
13.00 Mtrs
02.
EQ-I

0000 hrs

01.09.2013
22.09.2013
2400 hrs
18.09.2013
30.09.2013
11.50 Mtrs
03.
EQ-II

0000 hrs

01.09.2013
22.09.2013
2400 hrs
18.09.2013
30.09.2013
12.00 Mtrs
04.
EQ-III

0000 hrs

01.09.2013
22.09.2013
2400 hrs
18.09.2013
30.09.2013
12.50 Mtrs
05.
CQ-II

0000 hrs

01.09.2013
22.09.2013
2400 hrs
18.09.2013
30.09.2013
13.00 Mtrs

Note:  1.       The above notice is purely temporary and can be withdrawn at any time
                   without prior information due to sudden change in weather condition.

2.       Draft for other days for above berths and draft for other berths shall remain as per the original notification No.:MD/SHS/TECH-26/2013/771 Dt.17.04.2013.

3.         In addition to the above, vessels with beam size upto 38.00 Mtrs. may also be accepted for berthing at CQ-1, SQ, EQ-1, EQ-2, IOB & CB-1 at permissible LOA & draft for the berth during favourable weather conditions.



Sd/-
 Dy. Conservator
Paradip Port Trust
To
          All Shipping Agents
          Paradip Port.

Copy to:
1.       All Exporters / Importers (Through the Traffic Manager, PPT)
2.       Traffic Manager, PPT / Chief Engineer, PPT / CE & ME, PPT / DM (MS), PPT
          3.       Harbour Master, PPT / All Pilots, PPT / SHS, PPT / Chief Officer (F), PPT / Port

                   Signal Station, PPT

Saturday, July 13, 2013

No Dues Certificate from Port authorities by Importers/Exporters for berthing of vessels

All Importers and Exporters are required to obtain a No Dues Certificate from Traffic Department of Paradip Port Trust for allowing their vessels to berth. The No Dues Certificate is to be presented in the daily DTR meeting for the respective Importers or Exporters for the ships carrying their cargo.

Monday, April 1, 2013

Gopalpur Port Opened for Commercial Traffic

 

Enhancement of Draft at various berths for the month of May 2013


PARADIP PORT TRUST
MARINE DEPARTMENT
…..


No.:MD/SHS/TECH-26/2012(Vol.I)/ Dated, the 01stApril 2013
N O T I C E


Sub: Enhancement of Draft at various berths for the month of May 2013


With reference to our earlier notice regarding permissible draft at various Berths, the draft at following berths are hereby temporarily enhanced as follows for the month of May 2013 considering prevailing weather and tidal conditions:



Sl. No.


Name of the Berths


From


To


Permissible Draft


Time


Date


Time


Date


01.


SQ



0000 hrs



01.05.2013

13.05.2013

29.05.2013


2400 hrs


07.05.2013

23.05.2013

31.05.2013


13.00 Mtrs


02.


EQ-I



0000 hrs



01.05.2013

13.05.2013

29.05.2013


2400 hrs


07.05.2013

23.05.2013

31.05.2013


11.50 Mtrs


03.


EQ-II



0000 hrs



01.05.2013

13.05.2013

29.05.2013


2400 hrs


07.05.2013

23.05.2013

31.05.2013


12.00 Mtrs


04.


EQ-III



0000 hrs



01.05.2013

13.05.2013

29.05.2013


2400 hrs


07.05.2013

23.05.2013

31.05.2013


12.50 Mtrs


05.


CQ-I



0000 hrs



01.05.2013


2400 hrs


31.05.2013


14.50 Mtrs


06.


CQ-II



0000 hrs



01.05.2013

13.05.2013

29.05.2013


2400 hrs


07.05.2013

23.05.2013

31.05.2013


13.00 Mtrs


07.


North Oil Jetty



0000 hrs



01.05.2013

13.05.2013

29.05.2013


2400 hrs


07.05.2013

23.05.2013

31.05.2013


13.50 Mtrs




Note: 1. Minimum Permissible Draft for SQ is temporarily declared as 12.50 Mtrs. for
entire month of May-2013.

2. Berthing of vessels at CQ-1 with 14.50 Mtrs. Draft shall be carried out during high Water of tide at least 1.5 Mtrs.


3. The above notice is purely temporary and can be withdrawn at any time
without prior information due to sudden change in weather condition.

4. This shall be reviewed again towards the end of May 2013.


5. Draft for other days for above berths and draft for other berths shall remain as per the original notification No.:MD/SHS/TECH-26/2011/1539 Dt.24.08.2012.


Sd/-
Dy. Conservator
Paradip Port Trust


To
All Shipping Agents
Paradip Port.

Copy to:
1. All Exporters / Importers (Through the Traffic Manager, PPT)
2. Traffic Manager, PPT / Chief Engineer, PPT / CE & ME, PPT / DM (MS), PPT
3. Harbour Master, PPT / All Pilots, PPT / SHS, PPT / Chief Officer (F), PPT / Port Signal Station, PPT