PARADIP PORT TRUST
MARINE DEPARTMENT
…..
No.:MD/SHS/TECH-26/2012(Vol.I)/ Dated, the 01stApril 2013
N O T I C E
Sub: Enhancement of Draft at various berths for the month of May 2013
With reference to our earlier notice regarding permissible draft at various Berths, the draft at following berths are hereby temporarily enhanced as follows for the month of May 2013 considering prevailing weather and tidal conditions:
Sl. No.
|
Name of the Berths
|
From
|
To
|
Permissible Draft
| ||
Time
|
Date
|
Time
|
Date
| |||
01.
|
SQ
|
0000 hrs
|
01.05.2013
13.05.2013
29.05.2013
|
2400 hrs
|
07.05.2013
23.05.2013
31.05.2013
|
13.00 Mtrs
|
02.
|
EQ-I
|
0000 hrs
|
01.05.2013
13.05.2013
29.05.2013
|
2400 hrs
|
07.05.2013
23.05.2013
31.05.2013
|
11.50 Mtrs
|
03.
|
EQ-II
|
0000 hrs
|
01.05.2013
13.05.2013
29.05.2013
|
2400 hrs
|
07.05.2013
23.05.2013
31.05.2013
|
12.00 Mtrs
|
04.
|
EQ-III
|
0000 hrs
|
01.05.2013
13.05.2013
29.05.2013
|
2400 hrs
|
07.05.2013
23.05.2013
31.05.2013
|
12.50 Mtrs
|
05.
|
CQ-I
|
0000 hrs
|
01.05.2013
|
2400 hrs
|
31.05.2013
|
14.50 Mtrs
|
06.
|
CQ-II
|
0000 hrs
|
01.05.2013
13.05.2013
29.05.2013
|
2400 hrs
|
07.05.2013
23.05.2013
31.05.2013
|
13.00 Mtrs
|
07.
|
North Oil Jetty
|
0000 hrs
|
01.05.2013
13.05.2013
29.05.2013
|
2400 hrs
|
07.05.2013
23.05.2013
31.05.2013
|
13.50 Mtrs
|
Note: 1. Minimum Permissible Draft for SQ is temporarily declared as 12.50 Mtrs. for
entire month of May-2013.
2. Berthing of vessels at CQ-1 with 14.50 Mtrs. Draft shall be carried out during high Water of tide at least 1.5 Mtrs.
3. The above notice is purely temporary and can be withdrawn at any time
without prior information due to sudden change in weather condition.
4. This shall be reviewed again towards the end of May 2013.
5. Draft for other days for above berths and draft for other berths shall remain as per the original notification No.:MD/SHS/TECH-26/2011/1539 Dt.24.08.2012.
Sd/-
Dy. Conservator
Paradip Port Trust
To
All Shipping AgentsParadip Port.
Copy to:
1. All Exporters / Importers (Through the Traffic Manager, PPT) 2. Traffic Manager, PPT / Chief Engineer, PPT / CE & ME, PPT / DM (MS), PPT
3. Harbour Master, PPT / All Pilots, PPT / SHS, PPT / Chief Officer (F), PPT / Port Signal Station, PPT
No comments:
Post a Comment