PARADIP PORT
TRUST
MARINE
DEPARTMENT
…..
No.:MD/SHS/TECH-26/2012(Vol.I)/
Dated, the 25th
July 2013
N O T
I C E
Sub: Enhancement
of Draft at various berths for the month of September
2013
With reference to our earlier notice regarding permissible draft at
various Berths, the draft at following berths are hereby temporarily enhanced as
follows for the month of September 2013 considering prevailing
weather and tidal conditions:
Sl.
No.
|
Name of the
Berths
|
From
|
To
|
Permissible
Draft
| ||
Time
|
Date
|
Time
|
Date
| |||
01.
|
SQ
|
0000
hrs
|
01.09.2013
22.09.2013
|
2400
hrs
|
18.09.2013
30.09.2013
|
13.00
Mtrs
|
02.
|
EQ-I
|
0000
hrs
|
01.09.2013
22.09.2013
|
2400
hrs
|
18.09.2013
30.09.2013
|
11.50
Mtrs
|
03.
|
EQ-II
|
0000
hrs
|
01.09.2013
22.09.2013
|
2400
hrs
|
18.09.2013
30.09.2013
|
12.00
Mtrs
|
04.
|
EQ-III
|
0000
hrs
|
01.09.2013
22.09.2013
|
2400
hrs
|
18.09.2013
30.09.2013
|
12.50
Mtrs
|
05.
|
CQ-II
|
0000
hrs
|
01.09.2013
22.09.2013
|
2400
hrs
|
18.09.2013
30.09.2013
|
13.00
Mtrs
|
Note: 1.
The above notice is purely temporary and can be withdrawn at any time
without prior information due to sudden change in weather
condition.
2.
Draft for other days for above berths and draft for other berths shall
remain as per the original notification No.:MD/SHS/TECH-26/2013/771
Dt.17.04.2013.
3.
In addition to the above, vessels with beam size upto 38.00 Mtrs. may
also be accepted for berthing at CQ-1, SQ, EQ-1, EQ-2, IOB & CB-1 at
permissible LOA & draft for the berth during favourable weather
conditions.
Sd/-
Dy.
Conservator
Paradip
Port
Trust
To
All
Shipping Agents
Paradip
Port.
Copy
to:
1. All
Exporters / Importers (Through the Traffic Manager, PPT)
2. Traffic
Manager, PPT / Chief Engineer, PPT / CE & ME, PPT / DM (MS),
PPT
3. Harbour Master, PPT / All Pilots, PPT / SHS, PPT /
Chief Officer (F), PPT / Port
Signal Station, PPT
No comments:
Post a Comment