Total Page views

DAILY TRAFFIC REVIEW MINUTES of PARADIP PORT TRUST

Please click below link of PPT to access the DTR MINUTES.

http://www.paradipport.gov.in/dtu.php







Monday, April 1, 2013

Gopalpur Port Opened for Commercial Traffic

 

Enhancement of Draft at various berths for the month of May 2013


PARADIP PORT TRUST
MARINE DEPARTMENT
…..


No.:MD/SHS/TECH-26/2012(Vol.I)/ Dated, the 01stApril 2013
N O T I C E


Sub: Enhancement of Draft at various berths for the month of May 2013


With reference to our earlier notice regarding permissible draft at various Berths, the draft at following berths are hereby temporarily enhanced as follows for the month of May 2013 considering prevailing weather and tidal conditions:



Sl. No.


Name of the Berths


From


To


Permissible Draft


Time


Date


Time


Date


01.


SQ



0000 hrs



01.05.2013

13.05.2013

29.05.2013


2400 hrs


07.05.2013

23.05.2013

31.05.2013


13.00 Mtrs


02.


EQ-I



0000 hrs



01.05.2013

13.05.2013

29.05.2013


2400 hrs


07.05.2013

23.05.2013

31.05.2013


11.50 Mtrs


03.


EQ-II



0000 hrs



01.05.2013

13.05.2013

29.05.2013


2400 hrs


07.05.2013

23.05.2013

31.05.2013


12.00 Mtrs


04.


EQ-III



0000 hrs



01.05.2013

13.05.2013

29.05.2013


2400 hrs


07.05.2013

23.05.2013

31.05.2013


12.50 Mtrs


05.


CQ-I



0000 hrs



01.05.2013


2400 hrs


31.05.2013


14.50 Mtrs


06.


CQ-II



0000 hrs



01.05.2013

13.05.2013

29.05.2013


2400 hrs


07.05.2013

23.05.2013

31.05.2013


13.00 Mtrs


07.


North Oil Jetty



0000 hrs



01.05.2013

13.05.2013

29.05.2013


2400 hrs


07.05.2013

23.05.2013

31.05.2013


13.50 Mtrs




Note: 1. Minimum Permissible Draft for SQ is temporarily declared as 12.50 Mtrs. for
entire month of May-2013.

2. Berthing of vessels at CQ-1 with 14.50 Mtrs. Draft shall be carried out during high Water of tide at least 1.5 Mtrs.


3. The above notice is purely temporary and can be withdrawn at any time
without prior information due to sudden change in weather condition.

4. This shall be reviewed again towards the end of May 2013.


5. Draft for other days for above berths and draft for other berths shall remain as per the original notification No.:MD/SHS/TECH-26/2011/1539 Dt.24.08.2012.


Sd/-
Dy. Conservator
Paradip Port Trust


To
All Shipping Agents
Paradip Port.

Copy to:
1. All Exporters / Importers (Through the Traffic Manager, PPT)
2. Traffic Manager, PPT / Chief Engineer, PPT / CE & ME, PPT / DM (MS), PPT
3. Harbour Master, PPT / All Pilots, PPT / SHS, PPT / Chief Officer (F), PPT / Port Signal Station, PPT