PARADIP PORT
TRUST
MARINE
DEPARTMENT
…..
No.:MD/SHS/TECH-26/2012(Vol.I)/ Dated, the 27th August
2013
N O T I C
E
Sub: Enhancement of Draft at various berths for
the month of October
2013
With reference to our earlier notice
regarding permissible draft at various Berths, the draft at following berths are
hereby temporarily enhanced as follows for the month of October 2013 considering
prevailing weather and tidal
conditions:
Sl.
No.
|
Name of the
Berths
|
From
|
To
|
Permissible
Draft
| ||
Time
|
Date
|
Time
|
Date
| |||
01.
|
SQ
|
0000
hrs
|
01.10.2013
08.10.2013
21.10.2013
|
2400
hrs
|
04.10.2013
17.10.2013
31.10.2013
|
13.00
Mtrs
|
02.
|
EQ-I
|
0000
hrs
|
01.10.2013
08.10.2013
21.10.2013
|
2400
hrs
|
04.10.2013
17.10.2013
31.10.2013
|
11.50
Mtrs
|
03.
|
EQ-II
|
0000
hrs
|
01.10.2013
08.10.2013
21.10.2013
|
2400
hrs
|
04.10.2013
17.10.2013
31.10.2013
|
12.00
Mtrs
|
04.
|
EQ-III
|
0000
hrs
|
01.10.2013
08.10.2013
21.10.2013
|
2400
hrs
|
04.10.2013
17.10.2013
31.10.2013
|
12.50
Mtrs
|
05.
|
CQ-II
|
0000
hrs
|
01.10.2013
08.10.2013
21.10.2013
|
2400
hrs
|
04.10.2013
17.10.2013
31.10.2013
|
13.00
Mtrs
|
Note: 1.
The above notice is purely temporary and can be withdrawn at any time
without prior information due
to sudden change in weather
condition.
2. Draft for other days for above berths and
draft for other berths shall remain as per the original notification
No.:MD/SHS/TECH-26/2013/771
Dt.17.04.2013.
3. In addition to the above, vessels with
beam size upto 38.00 Mtrs. may also be accepted for berthing at CQ-1, SQ, EQ-1,
EQ-2, IOB & CB-1 at permissible LOA & draft for the berth during
favourable weather
conditions.
Sd/-
Dy.
Conservator
To
All Shipping
Agents
Copy
to:
1. All Exporters / Importers (Through the
Traffic Manager, PPT)
2. Traffic Manager, PPT / Chief Engineer,
PPT / CE & ME, PPT / DM (MS),
PPT
3. Harbour Master, PPT / All Pilots, PPT /
SHS, PPT / Chief Officer (F), PPT / Port
Signal Station,
PPT